Wednesday, January 9, 2013

 

EPC Q & A

E for EPC




1.                  Describe the data sheet development work flow process. 
Start with Rev A and the discipline activity and describe all the way to Rev 0.
2.                  When an engineering department receives a document for the first time, what is the first item on your ‘to-do’ list and why?
3.                  For client, are drawings reviewed in parallel or in series and why?
4.                  When we receive approvals from client and experts for welding documents / inspection / drawings, what is one thing that must be on the drawings before returning to vendor and Why?
Read more »

Labels: , , , , , , ,


Monday, July 2, 2012

 

Instrumentation Common Questions -2

EPC School 2012 Series

I for Instrumentation




Q: What is potential free contact? What is the significance and application of this contact?

Contacts having not potential. E.g. Relay contacts/ field switches contacts. They are used in logic circuits. A potential free contact is usually wired into an electrical circuit. However it must be ensured that the contact ratings are suitable for the service in which it is used.

Read more »

Labels: , , , , , , , , , , , ,


 

Instrumentation Common Questions -1


EPC School 2012 Series




Q: Why do we use pipelines for transmitters in steam service and tubes in any other service?

A) Pipe as well as tubes can be used for steam line transmitters. However pipe walls being thicker provide more corrosion allowance. B) For steam services, with high temp and pressure needs IBR standard. Max. Working pressure is 153 kg/cm2 at 38 degC for 1/2” O.D tube as per design standard. So tube is not suitable.

Read more »

Labels: , , , , , , ,


This page is powered by Blogger. Isn't yours?

Subscribe to Posts [Atom]